Case Study

Offshore Renewables

RESPONSIVE CABLE SERVICES

Map-pin Holland, Greece, UK

OSPREY’S CABLING SERVICE ACCELERATES PROJECT SCHEDULE

Osprey’s cabling service is second to none. We’ve got the experience to accelerate offshore project schedules – even marginal, half-day gains on a project can make a big difference for project managers who are tied to tight timetables.

REACTIVE CAPABILITY IS THE KEY TO ACCELERATION 

Seagreen, Scotland’s largest fixed base offshore wind farm, is increasing its capacity – taking the project’s 36 turbines from 360MW to up to 500MW. To bring that energy onshore means using high-quality cables that don’t lose structural integrity during transit or installation.

Osprey’s cabling team delivers certainty in projects like this. Our teams and our equipment are allocated with a guarantee – surety of supply starts as early as possible in the tendering process.

In this instance, it meant Osprey Intrepid was on her way with our own cable carousel and equipment from our partner – Dutch Offshore Contractors B.V. to Sousaki in Greece, less than 10 days from the award of contract. There, our on-site project managers, in-house engineers and naval architects supervised loading (and testing) over 70km of cable into two, 2,000te carousels.

CONNOR TAYLOR, PROJECT MANAGER

“Everyone who’s working on the project understands the importance of staying on track. We build time risks in and, for cabling, of course we always factor time for testing in, too. Our carousels move at up to 12 metres per minute, so we knew it would take just under 7 days to load this length of cable. This put us on schedule for sailing back to the Port of Blyth, to offload into the secure storage facilities there.”

Unloading at Blyth started as soon as possible. The team anticipated a 9-day unload to ensure the integrity of the cables, but in the end, this only took 8 and a half days.

NEIL SCHOFIELD, MANAGING DIRECTOR, MARINE PROJECTS:

“We have the experience to recognise how and where a process can be accelerated safely. In some situations, this may only put an extra hour or so into the timeline, but when it’s half a day, that can make a huge difference for multiple contractors.”

 

Delivering

  • Barging
  • Cable Carousels
  • Cable Logistics
  • Engineering
  • Project Management
“With in-house engineers and project managers, we can always be super reactive and, wherever we can, we'll save time as well as money..."
Neil Schofield, Managing Director, Marine Projects

See us at work

More case studies

Edgcott Road: 112-Metre Road Bridge

HS2 will build over 11 miles of viaducts and bridges. The Osprey CC-3800 was deployed with a 54-metre boom to provide contract lift services on bridges at Edgcott Road.

Find out more

HPC – RPV installation

RPV DELIVERY - A STATIC, DYNAMIC SOLUTION

At Hinkley Point C, we've developed a RORO solution that delivers oversized assets to site in a new way - increasing productivity across the construction site.

Find out more

Tintagel Bridge installation

Award-winning assets, innovation in action

The new English Heritage walkway at Tintagel is an award-winning installation. Our solution overcame many obstacles associated with overland delivery to this outlying location.

Find out more

Problem-solving for Petrochem

Problem-solving for Petrochem

Minimal downtime for a petrochemical site is critical and our approach kept our operations down to a minimum.

Find out more

PRIORITISING QHSE IN LOGISTICS

Osprey's QHSE team guides all we do

Ellie, one of our QHSE Officers, works specifically on specialist logistics for Hinkley Point C. This puts her at the heart of delivering nuclear success. 

Find out more

RESPONSIVE, RELIABLE PORT SERVICES

Vessel owners trust for Port Services.

RORO, breakbulk, containers, oversized cargoes – along with all the documentation, negotiable Bills of Lading, inventory-linked and non-inventory linked customs entries and supporting services.

Find out more

NETWORK RAIL, BEWSEY STREET

Jacked lifting solves location problems.

Rail bridges are often in challenging locations. See how we deployed our Enerpac JS250 system to overcome these problems.

Find out more

HPC POLAR CRANE DELIVERY

Collaboration reduces risks and costs.

We bring multiple specialist logistics' partners together - a great example of this can be seen in the delivery of two Polar Crane Beams in to HPC.

Find out more

UPGRADING M4 MOTORWAY BRIDGES

Reducing possession times.

Getting involved early and having the in-house heavy lift equipment to guarantee supply surety - it all makes a difference for projects of this scale.

Find out more

HPC WORLD’S LARGEST STEAM TURBINE

Early planning builds efficiencies into logistics.

Through early contractor engagement and our repeatable Shared Services model, we reduce risks and costs in the delivery of critical assets to large sites.

Find out more

Accreditations and memberships

ISO 9001 logo certificate for Osprey

ISO 14001 Badge for Osprey

QMS ISO 45001 Logo Certificate for Osprey

CPA Collective Mark logo for Osprey

Constructionline Gold Member logo for Osprey

CHAS Accredited Contractor logo for Osprey

LEEA Associate Member Logo for Osprey

RISQS Railway Verified logo for Osprey

ROSPA Award 2022 presented to Osprey

Fit For Offshore Renewables status awarded to Osprey.

Supported by Offshore Wind Growth Partnership logo for Osprey.

logo showing that Osprey is an associate member of CECA Midlands

Logo showing that Osprey is a member of NOF

Osprey is a member of the NIA; the Nuclear Industry Association.

Logo showing that Osprey is a member of BIFA

Logo showing that Osprey is part of Energi Coast