RESPONSIVE CABLE SERVICES

Map-pin Holland, Greece, UK

OSPREY’S CABLING SERVICE ACCELERATES PROJECT SCHEDULE

Osprey’s cabling service is second to none. We’ve got the experience to accelerate offshore project schedules – even marginal, half-day gains on a project can make a big difference for project managers who are tied to tight timetables.

REACTIVE CAPABILITY IS THE KEY TO ACCELERATION 

Seagreen, Scotland’s largest fixed base offshore wind farm, is increasing its capacity – taking the project’s 36 turbines from 360MW to up to 500MW. To bring that energy onshore means using high-quality cables that don’t lose structural integrity during transit or installation.

Osprey’s cabling team delivers certainty in projects like this. Our teams and our equipment are allocated with a guarantee – surety of supply starts as early as possible in the tendering process.

In this instance, it meant Osprey Intrepid was on her way with our own cable carousel and equipment from our partner – Dutch Offshore Contractors B.V. to Sousaki in Greece, less than 10 days from the award of contract. There, our on-site project managers, in-house engineers and naval architects supervised loading (and testing) over 70km of cable into two, 2,000te carousels.

CONNOR TAYLOR, PROJECT MANAGER

“Everyone who’s working on the project understands the importance of staying on track. We build time risks in and, for cabling, of course we always factor time for testing in, too. Our carousels move at up to 12 metres per minute, so we knew it would take just under 7 days to load this length of cable. This put us on schedule for sailing back to the Port of Blyth, to offload into the secure storage facilities there.”

Unloading at Blyth started as soon as possible. The team anticipated a 9-day unload to ensure the integrity of the cables, but in the end, this only took 8 and a half days.

NEIL SCHOFIELD, MANAGING DIRECTOR, MARINE PROJECTS:

“We have the experience to recognise how and where a process can be accelerated safely. In some situations, this may only put an extra hour or so into the timeline, but when it’s half a day, that can make a huge difference for multiple contractors.”

 

Delivering

  • Barging
  • Cable Carousels
  • Cable Logistics
  • Engineering
  • Project Management
“With in-house engineers and project managers, we can always be super reactive and, wherever we can, we'll save time as well as money..."
Neil Schofield, Managing Director, Marine Projects

See us at work

More case studies

Osprey Delivers Second Reactor Pressure Vessel

Another major milestone in the delivery of the UK’s new nuclear generation.

Find out more

HPC LOGISTICS: TUNNEL BORING MACHINES

Port-to-site logistics for nuclear construction.

Tunnel boring machine logistics provided valuable learnings – not only for HPC, but also for other clients needing port-to-site transport on this scale.

Find out more

COMBWICH WHARF, MARINE ENGINEERING

Osprey Marine Engineering redesigned Combwich Wharf to handle abnormal and indivisible nuclear loads safely.

Find out more

TURBINE INSTALL, VALERO REFINERY

Osprey delivered marine transport and heavy-lift services for prefabricated substation units supporting Valero’s turbine installation.

Find out more

TOWHEADS, BG KNARR

Osprey supported the BG Knarr field development in the Norwegian North Sea, delivering towhead operations via beach landing.

Find out more

GUNFLEET SANDS

Osprey managed transport and handling of turbines, foundations, and cables for Gunfleet Sands Offshore Wind Farm

Find out more

TRANSHIPMENT, HPC REACTOR

Osprey safely transported EDF’s 500-tonne Reactor Pressure Vessel to Hinkley Point C

Find out more

Edgcott Road: 112-Metre Road Bridge

HS2 will build over 11 miles of viaducts and bridges. The Osprey CC-3800 was deployed with a 54-metre boom to provide contract lift services on bridges at Edgcott Road.

Find out more

HPC – RPV installation

RPV DELIVERY - A STATIC, DYNAMIC SOLUTION

At Hinkley Point C, we've developed a RORO solution that delivers oversized assets to site in a new way - increasing productivity across the construction site.

Find out more

Tintagel Bridge installation

Award-winning assets, innovation in action

The new English Heritage walkway at Tintagel is an award-winning installation. Our solution overcame many obstacles associated with overland delivery to this outlying location.

Find out more

Accreditations and memberships

ISO 9001: 2015 Certification

ISO 14001: 2015 Certification

ISO 45001: 2015 Certification

CPA Collective Mark logo for Osprey

Constructionline Gold Member logo for Osprey

CHAS Accredited Contractor logo for Osprey

LEEA Associate Member Logo for Osprey

RISQS Railway Verified logo for Osprey

ROPSA Gold Medal Awards 2023

Fit For Offshore Renewables status awarded to Osprey.

Supported by Offshore Wind Growth Partnership logo for Osprey.

logo showing that Osprey is an associate member of CECA Midlands

Osprey is a member of the NIA; the Nuclear Industry Association.

Logo showing that Osprey is a member of BIFA

Logo showing that Osprey is part of Energi Coast