INNOVATIVE SHIPBUILDING SOLUTION

Map-pin Isle of Wight

UNIQUE PLAN KEEPS COSTS DOWN TO SUPPORT UK SHIPBUILDING

When our client, the Wight Shipyard Company, needed a Twin City Liner catamaran moved on the Isle of Wight, we were asked to come up with a plan. This seemed like a simple project, but because these vessels weigh up to 112 tonnes, they need lifting with more-capable cranes. This gave us something of a challenge.

Instead of shipping cranes out on our own barges, we came up with a different plan that kept the project’s costs down for our client. We used the Isle of Wight ferry.

At first glance, this isn’t possible. The ferry can’t handle the combined weight of an LTM1800 and LG1550. But with some lateral thinking, we came up with an engineered solution that involved dismantling our equipment down.

THE SOLUTION: BREAKING DOWN OUR CRANES 

  • To lift the first catamaran – a 112te Red Jet 7 – we stripped both cranes down to their basic parts, allocated extra support vehicles, and then shipped everything over to the Isle of Wight.
  • Our LTM1800 and the LG1550, their supporting kit, our teams and a number of Self Propelled Modular Transporters were all sent over to the Isle of Wight using the standard passenger ferry.
  • Once on the island, we rebuilt everything. This meant we could carry then out a basic tandem lift, lifting each boat from its cradle into the water.
  • The second catamaran – weighing in at 72te – was designed with different lift-location points, so an identical lift wasn’t possible  Working with the lifting beam manufacturer, we came up with a bespoke plan that meant the lift be carried out by a single crane.

MARINE BACKGROUND, UNIQUE SOLUTIONS

With our marine background, we knew we had the ideal combination of expertise and equipment. Osprey has some of the UK’s most capable cranes, the right rigging and haulage partners, and the trained crews – but this was an unusual project.

We solved the problem by asking if there was ‘a better way’ to engineer the transport solution. That’s how we approach every job, getting involved as soon as we can to find the right options that will meet our clients’ needs.

Delivering

  • Engineering
  • LG1550 Crane
  • LTM1800 Crane
  • Project Management
  • SPMTs
“A brilliant job from a well-organized and motivated customer-orientated team. We are in no doubt, we’re working with the best in the business.”
Jack Rushton, Wight Shipyard Company

See us at work

More case studies

HPC – RPV installation

RPV DELIVERY - A STATIC, DYNAMIC SOLUTION

At Hinkley Point C, we've developed a RORO solution that delivers oversized assets to site in a new way - increasing productivity across the construction site.

Find out more

Tintagel Bridge installation

Award-winning assets, innovation in action

The new English Heritage walkway at Tintagel is an award-winning installation. Our solution overcame many obstacles associated with overland delivery to this outlying location.

Find out more

Problem-solving for Petrochem

Problem-solving for Petrochem

Minimal downtime for a petrochemical site is critical and our approach kept our operations down to a minimum.

Find out more

PRIORITISING QHSE IN LOGISTICS

Osprey's QHSE team guides all we do

Ellie, one of our QHSE Officers, works specifically on specialist logistics for Hinkley Point C. This puts her at the heart of delivering nuclear success. 

Find out more

RESPONSIVE, RELIABLE PORT SERVICES

Vessel owners trust for Port Services.

RORO, breakbulk, containers, oversized cargoes – along with all the documentation, negotiable Bills of Lading, inventory-linked and non-inventory linked customs entries and supporting services.

Find out more

RESPONSIVE CABLE SERVICES

Safely accelerating offshore project schedules

Knowing our equipment, having in-house expertise, if we can reduce the time taken to deliver a project - we will.

Find out more

NETWORK RAIL, BEWSEY STREET

Jacked lifting solves location problems.

Rail bridges are often in challenging locations. See how we deployed our Enerpac JS250 system to overcome these problems.

Find out more

HPC POLAR CRANE DELIVERY

Collaboration reduces risks and costs.

We bring multiple specialist logistics' partners together - a great example of this can be seen in the delivery of two Polar Crane Beams in to HPC.

Find out more

UPGRADING M4 MOTORWAY BRIDGES

Reducing possession times.

Getting involved early and having the in-house heavy lift equipment to guarantee supply surety - it all makes a difference for projects of this scale.

Find out more

HPC WORLD’S LARGEST STEAM TURBINE

Early planning builds efficiencies into logistics.

Through early contractor engagement and our repeatable Shared Services model, we reduce risks and costs in the delivery of critical assets to large sites.

Find out more

Accreditations and memberships

ISO 9001 logo certificate for Osprey

ISO 14001 Badge for Osprey

QMS ISO 45001 Logo Certificate for Osprey

CPA Collective Mark logo for Osprey

Constructionline Gold Member logo for Osprey

CHAS Accredited Contractor logo for Osprey

LEEA Associate Member Logo for Osprey

RISQS Railway Verified logo for Osprey

ROSPA Award 2022 presented to Osprey

Fit For Offshore Renewables status awarded to Osprey.

Supported by Offshore Wind Growth Partnership logo for Osprey.

logo showing that Osprey is an associate member of CECA Midlands

Logo showing that Osprey is a member of NOF

Osprey is a member of the NIA; the Nuclear Industry Association.

Logo showing that Osprey is a member of BIFA

Logo showing that Osprey is part of Energi Coast