Onshore Renewables

`

ACCELERATING THE ENERGY TRANSITION

The UK’s climate change goals are ambitious. We’re proud to support the businesses making a prominent contribution to global, low-carbon objectives. Our 15-year track record is extensive and we’re currently working in the UK and across Europe.

End clients depend on us to meet the challenge of installing ever-higher hub heights, while also finding efficiencies – the faster we can build, safely, the sooner that capital is being put to good use. On site, our seasoned crews achieve market-leading relocation times between hardstands to ensure clients reach critical milestones.

We operate a diverse range of cranes – our LG1750, CC3800 and LG1550 are the mainstay of our onshore wind fleet.

 

 

THE RIGHT EQUIPMENT

The reality is, until they start generating, turbines are stranded capital. Our tools are chosen so that we can install ever-increasing hub heights – safely, rapidly.

We support that equipment with experienced teams who excel in rapid redeployment times between the pads – relocation times are crucial, we’re reducing timeframes for first electricity. 

  • In addition to our LG1750, our CC3800 comes with the full factory wind kit, which allows for a boom that extends to 159m with 12m fly jib.  

CASE STUDY

ONSHORE RENEWABLES

Osprey has been working with the renewables sector for over 15 years. We’ve installed over 220 wind turbines to date.

Our teams have been on site installing wind turbines in Sweden. Our heavy lift team has the experience to not just supply cranes handling the ever-increasing weights and sizes of these turbines’ components, but also to facilitate better working practices.

VIEW MORE CASE STUDIES

HEAVY LIFT TEAM

For onshore renewables, experience is key. Our teams understand what’s needed, and why, and how we can use our experience to cut time and costs without cutting corners. 

Meet the team

See us at work

Case studies

Edgcott Road: 112-Metre Road Bridge

HS2 will build over 11 miles of viaducts and bridges. The Osprey CC-3800 was deployed with a 54-metre boom to provide contract lift services on bridges at Edgcott Road.

Find out more

HPC – RPV installation

RPV DELIVERY – A STATIC, DYNAMIC SOLUTION

At Hinkley Point C, we've developed a RORO solution that delivers oversized assets to site in a new way – increasing productivity across the construction site.

Find out more

Tintagel Bridge installation

Award-winning assets, innovation in action

The new English Heritage walkway at Tintagel is an award-winning installation. Our solution overcame many obstacles associated with overland delivery to this outlying location.

Find out more

Problem-solving for Petrochem

Problem-solving for Petrochem

Minimal downtime for a petrochemical site is critical and our approach kept our operations down to a minimum.

Find out more

PRIORITISING QHSE IN LOGISTICS

Osprey's QHSE team guides all we do

Ellie, one of our QHSE Officers, works specifically on specialist logistics for Hinkley Point C. This puts her at the heart of delivering nuclear success. 

Find out more

RESPONSIVE, RELIABLE PORT SERVICES

Vessel owners trust for Port Services.

RORO, breakbulk, containers, oversized cargoes – along with all the documentation, negotiable Bills of Lading, inventory-linked and non-inventory linked customs entries and supporting services.

Find out more

RESPONSIVE CABLE SERVICES

Safely accelerating offshore project schedules

Knowing our equipment, having in-house expertise, if we can reduce the time taken to deliver a project – we will.

Find out more

NETWORK RAIL, BEWSEY STREET

Jacked lifting solves location problems.

Rail bridges are often in challenging locations. See how we deployed our Enerpac JS250 system to overcome these problems.

Find out more

HPC POLAR CRANE DELIVERY

Collaboration reduces risks and costs.

We bring multiple specialist logistics' partners together – a great example of this can be seen in the delivery of two Polar Crane Beams in to HPC.

Find out more

UPGRADING M4 MOTORWAY BRIDGES

Reducing possession times.

Getting involved early and having the in-house heavy lift equipment to guarantee supply surety – it all makes a difference for projects of this scale.

Find out more

HPC WORLD’S LARGEST STEAM TURBINE

Early planning builds efficiencies into logistics.

Through early contractor engagement and our repeatable Shared Services model, we reduce risks and costs in the delivery of critical assets to large sites.

Find out more

UNIQUE TIDAL TURBINE LOGISTICS

Our transferable skills and marine heritage inspire unique solutions.

Such as this end-to-end project plan to load-out Orbital's 02 – the world's most powerful tidal turbine.

Find out more

NETWORK RAIL, RIVER STOUR

Reducing risk and rail possession times.

Our teams have pioneered installation techniques that reduce risk for other suppliers, and possession times for clients.

Find out more

DELIVERING ULTIMATE DIESEL GENERATORS

Supply chain complexity is never a problem.

Working with overseas partners, we mitigate the risks for transporting critical infrastructure to the UK – in this case, to Hinkley Point C.

Find out more

SEACOMBE FERRY TERMINAL

Unique lift using floating crane barge.

Tidal phases made this challenging, but this is where our in-house marine, heavy lift and civil engineering expertise come to the fore.

Find out more

NETWORK RAIL, WARRINGTON BRIDGE

Flexibility overcomes unexpected challenges.

Collaborative working lets us use different approaches to handle problems – things like adopting mechanical aids during the pandemic.

Find out more

NETWORK RAIL, PENSTONE BRIDGE

Identifying a turntable lift saves time.

This approach is just one of the ways we seek to reduce possession times, overcoming the challenges of confined spaces for heavy lifts.

Find out more

MARINE ENGINEERING INNOVATION

Innovation? Sometimes the best solution is the simplest.

We use our marine engineering insights to find the best way of moving and installing assets.

Find out more

UPGRADING UK RAIL

Joined-up heavy lifting ensures on-time delivery.

Manufactured overseas, our client's locomotives couldn't be transported by rail. We engineered a safe, heavy lift that ensured an on-time delivery.

Find out more

NETWORK RAIL, WHALEY BRIDGE

Turntables and SPMTs overcome challenges.

When the space available is less than ideal, we find a new way to move the heaviest loads.

Find out more

JLR CABLE-SPAN BRIDGE

Early involvement means we can deliver in-built efficiency.

Jacking, moving and installing this cable-span bridge at the JLR works is a great example of the Osprey Way of Working…

Find out more

MANCHESTER AIRPORT BRIDGE INSTALLATION

Early planning is essential

Our collaborative approach factors in unusual considerations, such as flight paths and radar…

Find out more

Cable movements

Problem solving for safe cable movements

Moving a full inventory of array cables from the UK to a new storage facility in the Netherlands.

Find out more

NETWORK RAIL, GYPSY PATCH LANE

Reducing risk and rail possession times.

Our teams have pioneered installation techniques that reduce risk for other suppliers, and possession times for clients.

Find out more

END-TO-END TOWHEAD LOGISTICS

Overcoming challenges for end-to-end towhead logistics.

Our client needed several towheads shipping out, and our fully-engineered solution solved several problems.

Find out more

INNOVATIVE SHIPBUILDING SOLUTION

An ingenious solution for an everyday challenge.

When existing transport can’t ship our heavy lift cranes (our LTM1800 and LG1550), we still find a way to reach the site.

Find out more

Bahr Essalam Barge Support

End-to-end barge services

Fully supported with rapid, bespoke fastenings' design, vessels, crews, comms and documentation….

Find out more

HPC LOGISTICS: TUNNEL BORING MACHINES

Port-to-site logistics for nuclear construction.

Tunnel boring machine logistics provided valuable learnings – not only for HPC, but also for other clients needing port-to-site transport on this scale.

Find out more

DUMBARTON RAIL BRIDGE REPLACEMENT

Delivering rail infrastructure safely and efficiently.

We invented a way to remove and replace railway bridges faster and safer – reducing the usual installation time for projects of this kind.

Find out more

SUPPORTING NATIONAL GRID

Better logistics – delivered by sea, not road.

Our equipment and engineers make innovative logistics possible, and we work in partnership to reduce costs and timeframes.

Find out more

Osprey Graduate Programme Opens

Osprey Graduate Programme officially launched at Bristol University

Find out more

Amazing Women in Engineering

Osprey is proud to share the journey of our amazing QHSE Supervisor, Thea-Lize McKinlay.

Find out more

Will’s Story on the Osprey Graduate Programme

A Journey with Osprey: Will embarked on his professional journey with Osprey

Find out more

3D Visualisation For Logistical Efficiency

Groundbreaking technology promises to significantly advance logistics operations.

Find out more

BRISTOL COMPANIES DELIVER CRITICAL UK INFRASTRUCTURE

A Powerful Duo: Osprey and Kings Heavy Haulage

Find out more

Osprey re-awarded triple accreditations

Osprey Group re-awarded ISO 9001, 14001 and 45000

Find out more

Osprey – NEW LTR1100

The latest addition to our fleet, Liebherr's LTR110 Crawler Crane

Find out more

Osprey – a forces-friendly employer

Scott Kilding joined us from the army. Read about his career change here …

Find out more

Osprey expands UK based SPMT fleet

These SPMTs will be based in the UK – expanding our responsive capability…

Find out more

Osprey wins GOLD RoSPA award for QHSE

We’re thrilled – Osprey’s approach to QHSE has been recognised by RoSPA, the Royal Society for Prevention of Accidents, with a Gold Health & Safety Award.

Find out more

Accreditations and memberships

ISO 9001 logo certificate for Osprey

ISO 14001 Badge for Osprey

QMS ISO 45001 Logo Certificate for Osprey

CPA Collective Mark logo for Osprey

Constructionline Gold Member logo for Osprey

CHAS Accredited Contractor logo for Osprey

LEEA Associate Member Logo for Osprey

RISQS Railway Verified logo for Osprey

ROSPA Award 2022 presented to Osprey

Fit For Offshore Renewables status awarded to Osprey.

Supported by Offshore Wind Growth Partnership logo for Osprey.

logo showing that Osprey is an associate member of CECA Midlands

Logo showing that Osprey is a member of NOF

Osprey is a member of the NIA; the Nuclear Industry Association.

Logo showing that Osprey is a member of BIFA

Logo showing that Osprey is part of Energi Coast